click to enable zoom
loading...
We didn't find any results
View Roadmap Satellite Hybrid Terrain My Location Fullscreen Prev Next
Advanced Search

Home

Welcome to the website of the National Bridge Bank

As major clients for infrastructure projects, the cities of Amsterdam and Rotterdam have joined forces with Rijkswaterstaat (Netherlands Directorate-General for Public Works and Water Management) and the Bruggenstichting (Dutch Bridge Foundation) to establish an independent platform for reusing bridges and bridge components.

The objective is to provide all infrastructure authorities with an accessible means of reusing bridges. The integral reuse of bridges that are still in good condition is fully compatible with the Dutch government’s ambition to be climate neutral and to establish a circular economy by 2050.

By reusing rather than demolishing bridges as they become available, we can considerably reduce CO 2 emissions and the use of raw materials. In the years ahead,countless bridges and viaducts will be scheduled for renovation or replacement – each providing an ideal opportunity to contribute to our climate targets. If you have a bridge to offer, let us know – we can offer it through the site. Or if you’re in need of a bridge, we – the Dutch Bridge Foundation – can bring the two parties together.

Of course, reusing a bridge is a challenge. These Guidelines for the Use of Bridges (in Dutch) the steps you need to take if you’re considering reusing a bridge or offering one for reuse.

Which bridge suits your project?

Van Brienenoordbrug

Location
Function of the bridge
Material of superstructure
Components
Year of construction1965
Length of bridge307 m
Length of main span307 m
Width of roadway-
Likely to be available from (date): 2027
it-firm
June 12, 2023

Circulair Viaduct (systeem ‘Kampen’ )

Location
Function of the bridge
Material of superstructure
Components
Year of construction2018
Length of bridge-
Length of main span0 m
Width of roadwayModulair – zie systeemspecificatiesBeschikbaar dek met B = 5 x 1,50 = 7,50 m
Likely to be available from (date): Direct beschikbaar
it-firm
June 12, 2023

Keizersveerbruggen

Location
Function of the bridge
Material of superstructure
Components
Year of construction1936
Length of bridge288 m
Length of main span100 m
Width of roadway-
Likely to be available from (date): -
it-firm
June 12, 2023

Balgzandbrug te Anna-Paulowna

Location
Function of the bridge
Material of superstructure
Components
Year of construction1928
Length of bridge53 m
Length of main span53 m
Width of roadwaySpanten h.o.h. 7,40 m,totale breedte ca 12,00 m,geschikt voor 2 (smalle) rijstroken ennaastgelegen wandelpaden.
Likely to be available from (date): Medio 2025
it-firm
June 12, 2023

Brug 2274, De Ruijterkade te Amsterdam

Location
Function of the bridge
Material of superstructure
Components
Year of construction2005
Length of bridge31 m
Length of main span31 m
Width of roadwayTotale breedte 10,50 m: fietspad 4,50 m,voetpad 3,00 m en een tussenruimte van3,00 m voor de boogconstructie.
Likely to be available from (date): September 2020
it-firm
June 12, 2023

Compare